Global AI Infrastructure Procurement Roadmap
Trenikor facilitates the rapid deployment of elite NVIDIA Blackwell infrastructure through a structured, secure, and transparent procurement process. Our roadmap is designed to ensure institutional integrity and technical precision for every transaction.
01. Discovery
Submit your specific technical requirements, including node count and data center tier levels. Our engineers will review your specifications to ensure optimal configuration.
02. Intent
Formalize the engagement with a Letter of Intent (LOI). This document initiates the formal procurement process and secures your position in the supply chain queue.
03. Security
A 30% OEM deposit is required to secure supply chain priority and initiate manufacturing. All transactions are protected by NCNDA and IMFPA protocols.
04. Delivery
Ownership transfer occurs at the designated Duty-Free Zone within 4–6 weeks via rapid air transport. Final 70% payment is due upon delivery notice.
Initiate Technical Discovery
To ensure we provide the most accurate configuration for your enterprise, please provide the following high-intent data points:
Required Fields for Discovery:
• Institutional Email & Company Name
• Target Node Count (Min 1 cluster)
• Data Center Tier Level (III or IV)
• Power Density Requirements (kW per rack)
• Preferred Delivery Duty-Free Zone
